Close Go back Collapse all sections
Process Data set: Expanded clay concrete block outer wall; expanded clay, solid block, density 0,5, 500 kg/m3 (en) en de

Key Data Set Information
Location DE
Geographical representativeness description The data set represents the country specific situation in Germany, focusing on the main technologies, the region specific characteristics and / or import statistics.
Reference year 2023
Name
Base name ; Quantitative product or process properties
Expanded clay concrete block outer wall; expanded clay, solid block, density 0,5, 500 kg/m3
Use advice for data set The data set represents a cradle to gate inventory. It can be used to characterise the supply chain situation of the respective commodity in a representative manner. Combination with individual unit processes using this commodity enables the generation of user-specific (product) LCAs.
Technical purpose of product or process This product can be used in construction.
Classification number 1.3.04
Classification
Class name : Hierarchy level
  • oekobau.dat: 1.3.04 Mineral building products / Bricks, blocks and elements / Light concrete
General comment on data set This data set has been modeled according to the European Standard EN 15804+A2 for Sustainable Building. Results are depicted in modules that allow the structured expression of results over the entire life cycle.
Uncertainty margins 10
Description Product system almost completely covered. Good technological, temporal and geographic representativeness.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Material properties of the reference flow
    • gross density: 501.0 kg/m^3
Time representativeness
Data set valid until 2026
Time representativeness description Annual average
Technological representativeness
Technology description including background system The light concrete mix is produced in a mixer from washed pumice and exactly dosed quantities of water and bonding agents. The mixture arrives in the filling chest of the stone moulding machine which feeds the charging car. The charging car then goes over to the metallic mould (which is set on a board) and fills it up. The stone moulds contain enough cores (for the particular type of stone) for grooves or chambers.  With extra loading and vibration the mixture is compacted and the stone is pushed out of the mould. The stones on the underlying boards are taken to a high bay racking where they set for 24 to 36 hours. They are stored for 6 weeks, longer than the required standard of 28 days, in the yard.        In the disposal phase, a mechanical dismantling (excavator) is assumed in module C1. The transport in module C2 to the treatment plant takes place with a truck (50km). In module C3, the material is processed, any reinforcement is fed to a sink (no loads, no credits). A treatment loss of 25% was assumed. This loss is fed to an inert material landfill within Module C3 (average landfill emissions). In Module D, a credit for the net amount of material (excluding reinforcement and treatment losses) for the substitution of natural gravel as backfill material is given.
Flow diagram(s) or picture(s)
  • construction_raw density classes.jpg Image
  • construction_20_lightconcrete_ingred.jpg Image

Indicators of life cycle

IndicatorDirectionUnit Production
A1-A3
De-construction
C1
Transport
C2
Waste processing
C3
Recycling Potential
D
Input
  • 568.4
  • 0.2097
  • 3.021
  • 8.392
  • -4.113
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 568.4
  • 0.2097
  • 3.021
  • 8.392
  • -4.113
Input
  • 1717
  • 1.932
  • 27.3
  • 53.41
  • -10.43
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 1717
  • 1.932
  • 27.3
  • 53.41
  • -10.43
Input
  • 35.43
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0.4104
  • 0.0001993
  • 0.002822
  • 0.01483
  • -0.001998
Output
  • 7.901E-7
  • 8.228E-11
  • 1.329E-9
  • 1.234E-8
  • -8.029E-9
Output
  • 3.451
  • 0.0003199
  • 0.004615
  • 133.5
  • -6.889
Output
  • 0.02575
  • 0.000002608
  • 0.00004345
  • 0.0004841
  • -0.0003108
Output
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0
  • 0
  • 0
  • 363.8
  • 0
Output
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0
  • 0
  • 0
  • 0
  • 0

IndicatorUnit Production
A1-A3
De-construction
C1
Transport
C2
Waste processing
C3
Recycling Potential
D
  • 191.5
  • 0.1511
  • 2.13
  • 3.552
  • -0.7861
  • -1.42
  • 0.0009627
  • 0.01081
  • 0.01566
  • 0.0122
  • 192.6
  • 0.1473
  • 2.079
  • 3.502
  • -0.7889
  • 0.3178
  • 0.002851
  • 0.03999
  • 0.03452
  • -0.009443
  • 7.781E-10
  • 3.463E-14
  • 6.565E-13
  • 1.01E-11
  • -7.119E-12
  • 0.404
  • 0.002721
  • 0.002664
  • 0.02046
  • -0.00301
  • 0.8078
  • 0.001991
  • 0.002744
  • 0.02145
  • -0.003202
  • 1.571
  • 0.009964
  • 0.01181
  • 0.07754
  • -0.01461
  • 0.0002846
  • 3.997E-7
  • 0.000005661
  • 0.000008759
  • -0.000002818
  • 0.1443
  • 0.0009042
  • 0.0009723
  • 0.00702
  • -0.001321
  • 11.79
  • 0.001047
  • 0.0149
  • 0.4795
  • -0.0225
  • 0.0000115
  • 2.509E-8
  • 3.528E-7
  • 0.000001783
  • -1.274E-7
  • 1717
  • 1.932
  • 27.3
  • 53.41
  • -10.43