Close Go back Collapse all sections
Process Data set: Precast concrete part, stairs, (1,1 m wide, 9 steps each 16 cm); 1965 kg (en) en de

Key Data Set Information
Location DE
Geographical representativeness description The data set represents the country specific situation in Germany, focusing on the main technologies, the region specific characteristics and / or import statistics.
Reference year 2023
Name
Base name ; Quantitative product or process properties
Precast concrete part, stairs, (1,1 m wide, 9 steps each 16 cm); 1965 kg
Use advice for data set The data set represents a cradle to gate inventory. It can be used to characterise the supply chain situation of the respective commodity in a representative manner. Combination with individual unit processes using this commodity enables the generation of user-specific (product) LCAs.
Technical purpose of product or process This product can be used in construction.
Classification number 1.3.05
Classification
Class name : Hierarchy level
  • oekobau.dat: 1.3.05 Mineral building products / Bricks, blocks and elements / Precast concrete elements and goods
General comment on data set This data set has been modeled according to the European Standard EN 15804+A2 for Sustainable Building. Results are depicted in modules that allow the structured expression of results over the entire life cycle.
Uncertainty margins 20
Description Product system depicted except for a few missing processes / flows. Technological, temporal and geographic representativeness partly given.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Material properties of the reference flow
    • weight per piece: 1965.0 kg
Time representativeness
Data set valid until 2026
Time representativeness description Annual average
Technological representativeness
Technology description including background system The LCA of prefabricated reinforced concrete stairs considers the production of concrete (C30/37) and reinforced steel. An average density of concrete of 2.4t/m3, a density of steel of 7.86t/m3 and a reinforcement content of 0.6 Vol.-% are assumed. The product is a 1.1 m wide standard stairs with 9 stairs à 16 cm. The system boundary of the finished product is represented by the factory gate. Transports from the factory to the building site are not considered and must be included according to the system boundaries. In the disposal phase, a mechanical dismantling (excavator) is assumed in module C1. The transport in module C2 to the treatment plant takes place with a truck (50km). In module C3, the material is processed, any reinforcement is fed to a sink (no loads, no credits). A treatment loss of 25% was assumed. This loss is fed to an inert material landfill within Module C3 (average landfill emissions). In Module D, a credit for the net amount of material (excluding reinforcement and treatment losses) for the substitution of natural gravel as backfill material is given.
Flow diagram(s) or picture(s)
  • construction_de_prefabricated concrete stairs, 1,1 m width, 9 steps a 16 cm.jpg Image

Indicators of life cycle

IndicatorDirectionUnit Production
A1-A3
De-construction
C1
Transport
C2
Waste processing
C3
Recycling Potential
D
Input
  • 643
  • 0.8989
  • 12.95
  • 34.79
  • -14.33
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 643
  • 0.8989
  • 12.95
  • 34.79
  • -14.33
Input
  • 1506
  • 8.283
  • 117
  • 221.4
  • -36.34
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 1506
  • 8.283
  • 117
  • 221.4
  • -36.34
Input
  • 68.61
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0.6312
  • 0.0008547
  • 0.0121
  • 0.06146
  • -0.006959
Output
  • 0.000001389
  • 3.528E-10
  • 5.698E-9
  • 5.114E-8
  • -2.797E-8
Output
  • 92.88
  • 0.001371
  • 0.01979
  • 553.5
  • -24
Output
  • 0.05409
  • 0.00001118
  • 0.0001863
  • 0.002007
  • -0.001083
Output
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0
  • 0
  • 0
  • 1382
  • 0
Output
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0
  • 0
  • 0
  • 0
  • 0

IndicatorUnit Production
A1-A3
De-construction
C1
Transport
C2
Waste processing
C3
Recycling Potential
D
  • 260.6
  • 0.6473
  • 9.128
  • 14.72
  • -2.735
  • -0.4541
  • 0.003783
  • 0.0425
  • 0.05951
  • 0.04635
  • 260.4
  • 0.6313
  • 8.914
  • 14.52
  • -2.748
  • 0.6331
  • 0.01222
  • 0.1714
  • 0.1431
  • -0.0329
  • 1.245E-9
  • 1.485E-13
  • 2.815E-12
  • 4.186E-11
  • -2.48E-11
  • 0.2805
  • 0.01167
  • 0.01142
  • 0.08484
  • -0.01048
  • 0.3045
  • 0.008536
  • 0.01177
  • 0.08893
  • -0.01115
  • 1.04
  • 0.04272
  • 0.05065
  • 0.3214
  • -0.05089
  • 0.0003692
  • 0.000001714
  • 0.00002427
  • 0.00003631
  • -0.000009818
  • 0.09423
  • 0.003877
  • 0.004169
  • 0.0291
  • -0.0046
  • 12.98
  • 0.004487
  • 0.06388
  • 1.988
  • -0.07838
  • 0.0001226
  • 1.076E-7
  • 0.000001513
  • 0.000007392
  • -4.437E-7
  • 1506
  • 8.282
  • 117
  • 221.4
  • -36.34